Can you spot the three components of a Haliade 150-6MW pictured here? From left to right, you can see the blades pointing to the nacelle, which sits front and center, and the turbine towers standing tall on the right. Photographer @seenewphoto captured the sun rising above the port where these components awaited shipment to Merkur offshore wind farm for final installation. In total, some 2 million pieces passed through on their way to Merkur, where 66 Haliade 150-6MWs will soon spin. Head to the link in our bio to learn more about the manufacturing process.

#Haliade #renewables #renewableenergy #energysmart #turbines