GeneralElectricのインスタグラム(generalelectric) - 4月14日 01時15分


After they were sanded, painted and polished, the blades completed the production phase of the #WindCycle. Photographer @nk7 captured an aerial view of the finished blades, ready for shipment and installation at Merkur offshore wind farm. Longer blades means the offshore turbines can reach stronger and steadier winds. These giants laid back-to-back reach almost two football fields long. Head to our Story for more fun facts.
#Haliade #Merkur #renewables #funfacts #engineeringexplained


[BIHAKUEN]UVシールド(UVShield)

>> 飲む日焼け止め!「UVシールド」を購入する

1,764

17

2018/4/14

GeneralElectricを見た方におすすめの有名人