GeneralElectricのインスタグラム(generalelectric) - 11月16日 02時04分
At GE, we don’t shy away from a big challenge. Blue Energy Europe needs to move a nearly 3,500-ton biomass boiler 1,250 miles to Hürth, Germany. We’re treating the challenge as a larger-than-life puzzle. To get the job done, we’ll disassemble the boiler’s roughly 2,500 pieces, ship them in batches and fit everything back together on-site. Head to the link in our bio for more information.
#logistics #solutions
Photo by @ge__power
[BIHAKUEN]UVシールド(UVShield)
更年期に悩んだら
>> 飲む日焼け止め!「UVシールド」を購入する
2,119
25
2017/11/16